Monday 19 October 2015

New Pond Construction

The time has come to finally start constructing the new pond, the timber have all been cut to length and stacked ready for bolting together.

  
Once cut to length, it was a matter of stacking the timbers, on the bricks and bolting them together, using 160mm coach bolts, 3 in each end.





Once bolted together the underlay could be cut and set in place. to protect the liner, from the wood. 


 Once the liner was in place, we carefully unfolded the liner and layed it over the pond. to allow the PVC to heat up, 



Once the liner had been set in place we could start to fill it slowly, carefully moving out the creases.




Once it was full, we could start to rough trim off the excess liner, and add the pump.

And allow the water to settle.

No comments:

Post a Comment